General comment [This dataset was already contained in the ecoinvent database version 2. It was not individually updated during the transfer to ecoinvent version 3. Life Cycle Impact Assessment results may still have changed, as they are affected by changes in the supply chain, i.e. in other datasets. This dataset was generated following the ecoinvent quality guidelines for version 2. It may have been subject to central changes described in the ecoinvent version 3 change report (http://www.ecoinvent.org/database/ecoinvent-version-3/reports-of-changes/), and the results of the central updates were reviewed extensively. The changes added e.g. consistent water flows and other information throughout the database. The documentation of this dataset can be found in the ecoinvent reports of version 2, which are still available via the ecoinvent website. The change report linked above covers all central changes that were made during the conversion process.]
Medium sized plant. Output: 130'000 t/a, life time: 50 years. Site is shared with electrolysis plant. Total land use is allocated 50% to electrolysis, 50% to casting.
Production volume: 1.32236940655721 unit
Included activities end: Production hall, machinery and administrative buildings (including disposal)
Energy values: Undefined (default)
Geography: Some Swiss datasets are used for European processes.
Technology level: 3 Current (default)
Technology: Technology of one medium sized plant in Norway
Start date: 2002-01-01
End date: 2015-12-31
Is data valid for entire period: true
Macro-economic scenario name: Business-as-Usual
Version: 3.0.96.1
Created: 2010-07-28T18:17:59
Source: 127d634c-88de-499d-9d9b-a9141b271490_3ce2f7c0-30bf-48f3-8e31-d9deeb08cb05.spold
|